Batch No ( current ) | ||||
---|---|---|---|---|
S.No | User Name | Bidd Amount | Action | Time |
Shipping cost is set based on the location of where the product is shipped from the vendor. It is added to the total cost of the product. As for the time frame of receiving the order, it usually takes a maximum of 2 weeks, however this duration will be extended because of the current world wide situation.